BATHROOM REMODELING, BUILT TO CODE.Tile, plumbing, ventilation—the whole room, coordinated from start to finish.

We coordinate required permits, licensed trades, and inspections, giving you one point of contact from planning through completion.

Call AMBIZ · (425) 906-6488

Washington-registered general contractor · AMBIZL*761CG

Project approach

WHAT HAPPENS BETWEEN DEMO DAY AND YOUR FIRST SHOWER

Bathrooms bring plumbing, electrical, ventilation, waterproofing, and finish work together in a compact space. Improper work can lead to leaks, moisture damage, or subfloor problems later.

After demolition begins, we inspect exposed framing, plumbing, and subfloor conditions before rebuilding. Hidden conditions are sometimes discovered during demolition, especially in older homes.

Project inquiry

TELL US ABOUT THE BATHROOM

Age of the house, what you want changed, and when you want to start.

Add email or project details (optional)

Washington-registered general contractor · AMBIZL*761CG

By submitting, you ask AMBIZ to contact you about this project. Privacy Policy.

Explore our process, materials & project planning

How it goes

THE SEQUENCE

  1. 01

    Walkthrough

    On site

    We review visible conditions, measure the room, and discuss likely hidden conditions based on the home’s age and construction.

  2. 02

    Scope and estimate

    Confirmed in the project schedule

    We document selections, allowances, and the written scope, and identify potential change-order items before work begins.

  3. 03

    Permits

    Schedule varies

    Permit timing varies by jurisdiction, project scope, corrections, and agency workload. We confirm current review estimates before scheduling construction.

  4. 04

    Demo

    Confirmed in the project schedule

    Walls open. This is when hidden conditions show up.

  5. 05

    Rough-in

    Confirmed in the project schedule

    We coordinate plumbing, electrical work, framing, and blocking, with required inspections before work is concealed.

  6. 06

    Waterproofing and tile

    Confirmed in the project schedule

    We install the specified waterproofing assembly according to the system manufacturer’s requirements, followed by tile and grout.

  7. 07

    Finish

    Confirmed in the project schedule

    Vanity, fixtures, trim, paint, fan, glass.

  8. 08

    Final inspection

    Schedule varies

    Final inspections are scheduled with the agencies that issued the permits; responsible agencies differ by jurisdiction.

Typical planning ranges only. Actual timing depends on scope, jurisdiction, corrections, inspections, site conditions, weather, and material availability.

Before the estimate

WE COME OUT BEFORE WE QUOTE

A project manager reviews visible conditions, measures the space, and discusses scope, selections, access, and likely permit needs.

Permits & code

PERMITS: WHAT YOU NEED AND WHO HANDLES THEM

Within Seattle city limits, building and electrical permits are generally handled by SDCI, while plumbing permits are handled by Public Health — Seattle & King County. Other jurisdictions use different agencies.

WorkPermit
Cosmetic finish workMay be permit-exempt, while plumbing, electrical, structural, and layout changes may require permits. Verify the exact scope and address.
Moving a toilet, sink or shower drain. Adding a bathroom. New shower pan with a relocated drain. Water heater replacementPlumbing permit — Public Health, Seattle & King County
New or relocated outlets, a new exhaust fan, heated floor, new lighting, added circuitsElectrical permit — SDCI
Removing or adding a wall, changing a window opening, adding square footageBuilding permit — SDCI

Seattle has limited permit exemptions for certain minor repairs and alterations. We verify current scope and valuation rules with the applicable authority.

WHEN AN ARCHITECT OR ENGINEER GETS INVOLVED

Structural changes, additions, or work affecting foundations, egress, fire resistance, light, or ventilation may require professional design, depending on scope and jurisdiction.

Luxury Master Bath Transformation — Bellevue, WA

High-end bathroom renovation featuring a curved freestanding soaking tub, continuous porcelain slab tile flooring, frameless glass walk-in shower enclosure, and modern matte black hardware.

Japandi-Inspired Spa Retreat — Kirkland, WA

Custom wet-room bathroom remodel featuring an acoustic wood slat feature wall, circular LED vanity mirror, stone composite soaking tub, recessed rain shower, and curbless concrete-look tile flooring.

Custom Granite & Marble Steam Shower — Redmond, WA

High-end custom steam shower renovation featuring deep granite tile walls, marble hexagon mosaic ceiling and floor, built-in floating benches, brushed brass hardware, and integrated digital steam controls.

Geometric Art Deco Walk-In Shower — Sammamish, WA

Custom shower renovation featuring bold black geometric starburst pattern wall tile, Statuario marble framing, brushed brass edge trim, and an integrated linear drain.

Typical on-site schedule
Confirmed after scope review, selections, permits, and material availability
Layout change or repipe
Scheduled after design and permit review
Area
Seattle · Eastside
WA contractor registration
AMBIZL*761CG

Questions

What homeowners ask us

Do I need a permit to retile my shower?

Cosmetic finish work may be permit-exempt, while plumbing, electrical, structural, and layout changes may require permits. We verify the exact scope and address.

What affects the timeline for a bathroom remodel?

Layout changes, trade scheduling, inspections, material availability and waterproofing cure times all affect the schedule. We plan the work in sequence and confirm timing for your project before construction begins.

What happens if you find hidden damage during demolition?

Demolition can reveal moisture damage, worn piping or ventilation problems. We document what we find and discuss any necessary changes to the scope, cost and schedule before additional work proceeds.

Can I live in the house during the remodel?

Often, yes, if another functioning bathroom is available. If this is the only bathroom, we discuss temporary arrangements before work begins.

Do you handle the permit paperwork?

We coordinate required permit applications and inspections and explain which contractor or trade is responsible for each filing.

Start with a conversation

Planning a bathroom project?

Call or email AMBIZ to discuss the property, priorities and timing.

Call AMBIZ · (425) 906-6488